You can check-out assets to employees or customers or other assets or locations or projects.
Show the Check-out button only when the asset has a state of type Deployable.
After each check-out or check-in, the action is recorded in the History tab in the asset details.
Check-out
1. Select the Status : Ready
2. Check-out to: Select the Asset: this asset will be displayed in asset detail which is selected to receive check-out.
Select the Location: this asset will show in the selected location detail
3. Enter the Check-out date
4. Enter the Expected check-in date ( optional). This field is for storage only.
5. Enter the Notes